Use caseNuclear power · Turbine

A turbine inspection in one night at a U.S. nuclear plant

A U.S. nuclear plant cut a turbine inspection from about 8 hours to 90 minutes, with a crew of 1 instead of 5.

90 mininstead of about 8 hours, with a crew of 1 instead of 5
The challenge

Outage hours are expensive.

A turbine inspection during an outage took about 8 hours and a crew of 5. Outage time is tight, and every crew member on the job counts.

The approach

Send the X1 in first.

The team flew the X1, a caged inspection drone, into the turbine and watched the live video from outside. The X1 positions itself without GPS, using LiDAR and vision sensors, and carries a 4K camera with up to 10,480 lumens of light.

The result

~8 h → 90 min

Inspection time

5 → 1

Crew on the job

1 night

To finish the turbine